On-site cold cutting. Ready-to-weld results.
Cold cutting and beveling with zero heat or sparks—ideal for shutdowns and brownfield work. Our crews deliver work-ready end-preps that weld clean on the first pass.
- First-pass welds: consistent root face/angle for J/V bevels.
Faster outages: typical 48–72h turnaround with local re-grind.
Any wall/material: CS, SS, Duplex, Inconel, CuNi.